Elstal's latest references from Sweden: |
|
 |
Erection of 2 pcs of electrofilters (ESP) - 800 t |
|
Södra Cell / Värobacka 2001/02 |
 |
Erection of 1 pc of electrofilter
(ESP) - 300 t |
|
Sysav / Malmö - 2001/02 |
 |
Erection and insulation of 1
pc of electrofilter (ESP) - 170t |
|
Jämtkraft / Östersund 2001/02 |
 |
Manufacturing, erection and insulation
of bag filter - 160/250 t |
|
Handelö / Norrköping - 2001/02 |
 |
Erection of ducts, hoppers, ECO
- 255 t |
|
Handelö / Norrköping - 2001/02 |
 |
Manufacturing, erection and insulation
of bag filter - 113/160 t |
|
SAKAB / Kumla - 2002 |
 |
Dismantling, erection and insulation
of electrofilter (ESP) 80/48/450 t |
|
LKAB Kiruna - 2002 |
 |
Modification of ESP installation |
|
Fortum Högdalenverket/Stockholm
2002
|
 |
Manufacturing, erection and insulation
of bag filter - 45/70 t |
|
Hässleholm Energi - 2002/03 |
 |
Erection of ducts - 49 t |
|
SCA / Lilla Edet - 2003 |
 |
Manufacturing, erection and insulation
of bag filter - 250/260 t |
|
Norrenergi / Solna - 2003 |
 |
Assembly of bio fuel boiler -
1700 t |
|
Stora Enso / Börlange 2003/04 |
 |
Erection and insulation of electrofilter
(ESP) - 240 t |
|
Stora Enso / Borlänge 2004 |
 |
Erection and insulation of electrofilter
(type ELPAC 2) - 20 t |
|
Graninge / Sollefteå - 2004 |
 |
Assembly of steel construction,
ducts, installation - 1000 t |
|
Stora Enso / Skoghall - 2003/04 |
 |
Assembly and insulation of 2 ESP - 526 ton |
|
Stora Enso / Skoghall - 2004/05 |
 |
Welding of the boiler |
|
Stora Enso / Skoghall - 2004/05 |
 |
Assembly of evaporation piping |
|
Stora Enso / Skoghall - 2004/05 |
 |
Assembly of 3 ESP, 1 bag filter, ducts, tanks and gas suspension absorber - 1600 ton
|
|
LKAB Malmberget - 2005/06 |
 |
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1740 ton |
|
Kappa Kraftliner – Piteå - 2006 |
 |
Assembly and insulation of 2 ESP and ducts – 375 ton |
|
SCA / Obbola n.Umea – 2007 |
 |
Assembly and insulation of 1 ESP and ducts – 310 ton |
|
Boliden Ronnskarverken Skelleftehamn - 2007 |
 |
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1850 ton |
|
Ovik Energi / Ornskoldsvik 2007/2008 |
 |
Assembly and insulation of 1 ESP and ducts – 235 ton |
|
Ovik Energi / Ornskoldsvik 2007/2008 |
 |
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1608 ton |
|
Kalmar Energi / Kalmar 2008/2009 (*) |
Elstal's latest references from Denmark: |
|
 |
Delivery of SCR steel construction,
ducts and piping (in consortium) 1000 t |
|
Asneasverket - 2003/04 |
 |
Erection and insulation of electrofilter
(ESP) - 172 ton |
|
Reno Nord / Aalborg - 2004 |
Elstal's latest references from Germany: |
|
 |
Erection of 3 electofilters (ESP)
and ducts (in consoritum) 1110 t |
|
Zellstoff Stendal / Arneburg
2003 |
Elstal's latest references from Finland: |
|
 |
Assembly and insulation of 1 ESP with ducts 120 ton
|
|
UPM Kymmene Valkeakoski 2005 |
 |
Assembly of 1 ESP with ducts 470 ton |
|
Stora Enso Oulu 2006 |
| |
|
|
|
| |
|
(*) projects under construction |