Erection of 2 pcs of electrofilters (ESP) - 800 t - Södra Cell / Värobacka - 2001/02.
Svappavaara
2013
Assembly (part dismantling), insulation and electrical works of 3 x ESP, ducts and equipment - 1475 ton / 8296 m2
Sysav / Malmö
2002
Erection and insulation of 1 pc of electrofilter (ESP) - 300 t
Handelö / Norrköping
2002
Manufacturing, erection and insulation of bag filter - 160/250 t - Handelö / Norrköping-2001/02.
Jämtkraft / Östersund
2002
Erection and insulation of 1 pc of electrofilter (ESP) - 170t
Iggesund
2012
Assembly and insulation of 2 pcs of ESP and
ducts – 820 ton
Handelö / Norrköping
2002
Erection of ducts, hoppers, ECO, 800 t - Handelö / Norrköping - 2001/02.
SAKAB/Kumla
2002
Manufacturing, erection and insulation of bag filter - 113/160 t - SAKAB/Kumla-2002.
Kiruna
2002
Dismantling, erection and insulation of electrofilter (ESP) - 80/48/450 t - LKAB Kiruna 2002.
Stockholm
2002
Modification of ESP installation - FORTUM Högdalenverket/Stockholm 2002.
Hässleholm Energi
2003
Manufacturing, erection and insulation of bag filter + 45/70 t - Hässleholm Energi 2002/03 2002.
Lilla Edet / SCA
2003
Erection of ducts - 49t - SCA / Lilla Edet 2003.
Solna / Norrenergi
2003
Manufacturing, erection and insulation of bag filter + 250/260 t - Norrenergi / Solna 2003
Borlänge / Stora Enso
2004
Assembly of bio fuel boiler 1700t - Stora Enso / Börlange 2003/04.
Borlänge / Stora Enso
2004
Erection and insulation of electrofilter (ESP) - 240 t + Stora Enso / Borlänge 2004
Sollefteå / Graninge
2004
Erection and insulation of electrofilter (type ELPAC 2) - 20 t - Graninge / Sollefteå 2004
Skoghall / Stora Enso
2004
Assembly of steel construction, ducts, installation - 1000 t - Stora Enso / Skoghall 2003/04
Skoghall / Stora Enso
2005
Assembly and insulation of 2 ESP - 526 ton - Stora Enso / Skoghall 2004/05
Skoghall / Stora Enso
2005
Welding of the boiler - Stora Enso / Skoghall 2004/05
Skoghall / Stora Enso
2005
Assembly of evaporation piping - Stora Enso / Skoghall 2004/05
Malmberget / LKAB
2006
Assembly of 3 ESP, 1 bag filter, ducts, tanks and gas suspension absorber - 1600 ton - LKAB Malmberget 2005/06
Piteå / Kappa Kraftliner
2006
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1740 ton - Kappa Kraftliner – Piteå 2006
SCA / Obbola n.Umeå
2007
Assembly and insulation of 2 ESP and ducts – 375 ton
Ovik Energi / Ornskoldsvik
2008
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1850 ton
Ovik Energi / Ornskoldsvik
2008
Assembly and insulation of 1 ESP and ducts – 235 ton
Kalmar
2009
Assembly of the boiler type Hybex, incl. piping, equipment, ducts, tanks – 1608 ton
Mölndal
2009
Erection and insulation of bag filter, 150 ton.
Västerås
2014
Assembly of boiler, piping, ducts, equipment - 3000 ton
Karlstad
2014
Bag filter assembly and insulation, 102 ton / 1215 m2
Vimmerby
2014
Boiler assembly, delivery and assembly of piping - 205 ton / 40 ton
Linköping
2015
Erection (400 ton) and insulation (2.050 m2) of bag filter
NYBRO
2015
Erection of the boiler 265 ton, delivery/erection of piping 15 ton, delivery/erection of ducts and other steel construction 50 ton, insulation works 1.500 m2
Skövde
2015
Assembly of the boiler 233 ton, delivery and erection of piping 10 ton, erection of equipment 35 ton
Mönsterås
2017
Prefabrication, delivery and erection of evaporation plant, replacing of tanks, assembly of staircase in Södra Cell pulp and paper mill
Örebro
2017
Delivery and erection of steel construction for modernized boiler
Uppsala
2017
Erection, insulation and electrical works on new bag filter, 275 t construction, 2900 m2 insulation
Grums
2018
Prefabrication, delivery and erection of evaporation plant, replacing of tanks, assembly of construction in BillerudKorsnäs pulp and paper mill
Borås
2018
Assembly of boiler, piping, equipment, air and flue gas ducts - 2.100 tons
Skelleftehamn
2007
Assembly and insulation of 1 ESP and ducts, scope of 310 tons in Boliden Rönnskär, Skellefteå
Gävle
2017
Retrofit of ESP in Billerud Korsnäs Plant in Gävle
Lidköping
2021
complete assembly of BFB boiler with HP and LP piping incl insulation
Latvia
Launkalne
2012
Erection of boiler, prefabrication and erection of piping - 230 ton
Finland
Espoo
2013
Assembly of fabric filter type ELPAC
Valkeakoski
2005
Assembly and insulation of 1 electrostatic precipitator ESP with ducts 120 ton UPM Kymmene Valkeakoski 2005
Oulu / Stora Enso
2006
Assembly of 1 ESP with ducts – 470 ton - Stora Enso Oulu 2006
Vantaa
2013
Boiler erection, delivery and assembly of piping
Lohja
2015
Assembly of the boiler, piping, ducts, equipment and bag filter, totally 1.100 ton
Riihimäki
2016
Dismantling an old ESP, erection, insulation and electrical works of new ESP
Helsinki
2017
Prefabrication, delivery and erection of high and low pressure piping, air and flue gas ducts to the project Salmisaari
Denmark
Asneasverket
2004
Delivery, erection, insulation of SCR, ducts, piping (in consortium) - 900/1550 t - Asneasverket 2003/04
Aalborg / Reno Nord
2004
Erection and insulation of electrofilter (ESP) - 172 ton Reno Nord / Aalborg 2004
Germany
Arneburg / Zellstoff Stendal
2003
Erection of 3 electofilters (ESP) and ducts (in consoritum) 1110 t - Zellstoff Stendal / Arneburg 2003
France
Biganos
2009
Erection of bolier 622 ton, Ducts and equipment 641 ton, Piping 93 ton Bag filters 194 ton, Fuel and coarse equipment 157 ton.
Epinal
2014
Erection of the boiler and bag filter, delivery and erection of HP / LP piping
Norway
Hamar
2010
Erection and insulation of bag filter, 150 ton.
Estonia
Helme
2012
Erection of boiler, prefabrication and erection of piping - 230 ton
Austria
Linz
2020
Assembly of 2 pcs of electrostatic precipitators 400 tons at the Smurfit Kappa plant
Bruck an der Mur
2021
Delivery and erection of CS, SS and ES piping at the Norske Skog plant